What order do you build a bathroom?

When building a bathroom, the order of construction depends on a variety of factors, including the size, floor plan, and plumbing location. Generally speaking, however, you should follow this order:

1. Begin by laying out the room and defining the space, taking into account the size and layout of the room and the desired fixtures. Installation of walls, fixtures, and ventilation are usually the first tasks.

2. After the walls are in place, you will need to run the necessary water and drain lines. Some of these pipes and vents may need to be run through the floor or ceiling of adjacent rooms.

3. Once the plumbing is installed, you will want to insulate and drywall the walls and install the flooring. When installing drywall, remember to use a moisture-resistant variety if you will be installing tile later.

4. Now it is time to install the fixtures, such as the toilet, sink, bathtub, shower, and any other fixtures you choose.

5. Next, you can install the tile, if desired.

6. Once the tile and fixtures are complete, you can begin the finishing touches, such as painting, installing the vanity and countertops, and adding trim and other details.

7. Last but not least, it is time to connect the fixtures to the plumbing and turn on the water for the first time.

What comes first in bathroom remodeling?

Bathroom remodeling projects should begin with proper planning. At the start, it is important to clearly outline goals, determine a budget, and consider the overall aesthetic of the space. After these details are established, homeowners should focus on the basic requirements that must be addressed, such as plumbing and wiring.

This is often the most important (and most expensive) part of the project and it should be done before adding any finishing touches. Next, the fixtures, walls, and floors should be addressed. During this stage, homeowners should take into account the style, color, and pattern that will be used for each individual item.

Finally, accessories like mirrors, towel bars, and decorative items can be added for a personalized touch. With a comprehensive plan and these five steps in mind, a successful and beautiful bathroom remodeling project is within reach.

Do you tile before or after fitting a bathroom?

When fitting a bathroom, it is best to tile before you install fixtures such as the toilet, bath, and sink. Tiling is typically done first to ensure a strong and level foundation for the fixtures and other pieces.

Additionally, if the tiling is completed after the fixtures have already been installed, any slight misalignments or bubbles can make it harder to create a smooth surface.

Before tiling, the surface should be thoroughly cleaned and sealed. This will help to ensure that the tiles are correctly and securely bonded to the surface. Additionally, any large imperfections or uneven surfaces should be repaired and filled, so that the tiling is even and can be easily adjusted if necessary.

When tiling, it is important to use a good quality tile adhesive and grout. Additionally, thin-set mortar or a special flexible adhesive should be used between the tiles and the wall in wet areas to help increase water resistance.

Once the adhesive is dry, grout should be spread over the surface of the tiles to ensure a solid and even finish. Before applying the grout, it is important to make sure that the excess adhesive is completely removed, as this can cause problems with the grouting process.

Finally, after the tiling is dry, you can begin to fit the fixtures, such as the toilet, bath, and sink. The fixtures should be securely fixed in place and the pipework connected. If you need to cut tiles in order to fit the fixtures, be sure to use the appropriate tools, such as a cutting wheel or diamond blade, in order to make a neat and precise cut.

In conclusion, tiling should be done before fitting the bathroom fixtures in order to ensure a strong and level base and to avoid potential difficulties in creating a smooth surface. Additionally, it is important to use the correct products and tools when tiling in order to achieve a successful finish.

Do you do plumbing before tile?

No, generally the process for tiling should involve plumbing after the tile is laid. Depending on the scope of the project, the existing plumbing and tile may need to be removed first before any new plumbing work is done and the tile is laid.

This helps ensure that the plumbing is installed in the most effective and safe way possible, as well as ensure that there is a solid foundation for the tiles. After the plumbing is installed, a flexible sealant may be applied to help prevent any water that gets in between the tiles from getting into the subfloor or surrounding walls.

After the sealant has been applied, the tiles can be grouted and finished if necessary. Although it’s important to make sure all of the plumbing is done correctly and safely before laying the tile, it’s crucial to do the majority of plumbing work first before the tile is laid.

Do you put flooring under vanity?

Yes, it is recommended to put flooring under a vanity. This helps protect the walls and floor from water damage and other potential problems. Additionally, having flooring under the vanity helps keep the vanity itself level and stable, which is essential for ensuring proper installation and a successful long-term performance.

When installing flooring under a vanity, it is important to choose a material that is water-resistant and will be able to withstand the pressure and weight of the vanity itself. Vinyl plank flooring or tile are both excellent choices, as they will provide a long-lasting and attractive flooring solution under the vanity.

It is also important to have the proper underlayment in place, as this will help create a moisture barrier to protect the flooring and the vanity itself.

What should I install first in my bathroom?

When renovating or designing a bathroom, the first thing you should install is the plumbing fixtures, including the toilet, sink, and shower or tub. This is because you need a water source in order to complete the rest of the project.

After plumbing is installed, you should then install the walls, flooring, and fixtures like lights, fans, and mirrors. Once these are in place, you can start adding shelves, countertops, cabinets, and other accessories to complete the look.

What gets tiled first floor or walls?

The answer to this depends on the type of installation that is being done. Depending on the type of material being installed, one of these two areas may be better suited to start with. Generally speaking, when it comes to tiling, the floor is usually tiled first, as it allows for the walls to be fit to it, rather than the other way around.

From a practical standpoint, it is easier to adjust the leveling of the floor to the height of the wall than the opposite. Additionally, if it is necessary to tile the walls first, you run the risk of damaging the completed wall tiles when tiling the floor.

Should toilet sit on top of tile?

Yes, it is possible to mount a toilet on top of tile, but there are a few things to consider first. The most important factor is the weight of the toilet. Toilets are heavy and require secure mounting to the floor.

If the tile is laid on top of a wooden subfloor, it may not be sturdy enough to secure the toilet properly. Even if the existing tile is thick and sturdy, it may not be the best material to mount a toilet onto.

Depending on the type of toilet you are mounting, you may need to install a metal support flange that sits on top of the tile, which will provide the proper supports for the toilet. If the tile is laid on top of concrete, it may provide the necessary support for the toilet but it is still important to check with a professional installer to make sure that it is secure.

Additionally, you should consider the sealant between the toilet and the tile, as it can help prevent leaks and ensure that everything stays in place.

What are the stages of cleaning of a bathroom?

Cleaning a bathroom can seem like a daunting task, but when broken down into stages, it’s much easier. The basic stages of cleaning a bathroom include:

1. Preparing the Room: Before beginning any cleaning, it is important to prepare the bathroom. This includes clearing away any debris, such as towels, baskets, and decor, as well as any dirty laundry.

Vacuuming and sweeping the floor can also help to make the job of cleaning go smoother.

2. Sanitizing and Disinfecting: Sanitizing the toilet and other areas of the bathroom helps to reduce the presence of germs and bacteria that can lead to the spread of illnesses. Disinfecting is a more potent process and helps to eliminate any existing germs and bacteria.

3. Cleaning the Toilet and Sink: Toilets require special attention because of their regular use. This is done by using a toilet cleaner with brushes and scrubbing them to remove any stains and dirt. The sink follows shortly after, and they should both be scrubbed with a non-abrasive cleaner.

4. Cleaning the Mirrors and Shower: Cleaning the mirrors is done by using a glass cleaner or vinegar solution. It is important to use a clean cloth or paper towel to avoid transferring any dirt or dust.

For the shower, a lime and calcium remover can help to loosen any soap scum or hard water scale.

5. Cleaning the Tub: The tub should be cleaned with a non-abrasive cleaner and a soft brush or sponge. It is important to avoid any abrasive cleaning agents to prevent scratching or damaging the surface.

6. Final Touch: Once the entire bathroom is clean, it is important to add a final touch. Wiping down surfaces with a microfiber cloth, adding a linen spray, and ensuring trash cans are empty are just a few of the finishing touches that help to make a clean bathroom shine.

What should you not do when remodeling a bathroom?

When remodeling a bathroom, there are certain steps that should be taken to ensure the job is done well. However, there are also some steps that should not be taken. Here are a few things to avoid if you are remodeling a bathroom:

1. Don’t attempt to do plumbing work yourself if you don’t have the necessary experience. While some projects such as replacing faucets and showerheads can be done yourself, projects that involve drain pipes, sewage lines, and other plumbing fixtures should be left to a professional plumber.

2. Don’t use colorful and ornate grout if you are planning on retiling the walls or floors in your bathroom. While it may look nice initially, it can be hard to maintain and it won’t look as nice after several months.

3. Don’t forget to install a fan. While your bathroom may look nice with a brand new paint job, installing a fan will help keep the air fresh and mildew-free.

4. Don’t skimp on your budget for the project. While you may want to save money initially, it could cost you more in the long run when it comes to repairs.

5. Don’t forget to update your electrical wiring. As bathrooms are often damp and wet environments, it’s best to make sure the wiring is up to date. If you’re unsure, it’s best to call a professional electrician.

What are the 5 basic cleaning steps in order?

The 5 basic cleaning steps, in order, are as follows:

1. Preparation: Make sure you have all the necessary cleaning supplies and tools on hand and prepare the area that needs to be cleaned.

2. Dusting: Use a damp cloth or dusting mop to remove dust and dirt from the surfaces.

3. Vacuuming: Vacuum carpets, drapes, and upholstered furniture to remove dust and debris.

4. Mopping: Clean your floors with a damp mop to remove dirt, grime, and other contaminants.

5. Disinfecting: Use a disinfectant to kill germs and bacteria on surfaces, such as counters, toilets, and doorknobs.

How long does it take to redo an entire bathroom?

The amount of time required to redo an entire bathroom varies significantly and can depend on several different factors such as the size of the bathroom, the complexity of the renovation, and the materials and fixtures being used.

On average, most bathroom remodels can take anywhere between 1-3 weeks to complete depending on the extent of the remodel. If a contractor is being used to complete the project, they can usually provide a more accurate timeline based on the individual project details.